NEWS
NEWS

From 15 to 20, January 2024, customers from a Central Asian country visited our company for conducting the acceptance tests on the displacer liquid level transmitters they purchased.


   pic(3).jpg


Personally and carefully conduct the inspection of the calibration to each displacer liquid level transmitter


pic(5).jpg 


These displacer liquid level transmitters which have successfully passed all the tests and inspections are going to be packaged respectively


pic(7).jpg


Watch and experience the entire packaging process of a displacer liquid level transmitter

 

pic(9).jpg


Both parties sign the acceptance document  


pic(10).jpg


Celebrating the successful completion of the acceptance tests 


pic(11).jpg

 

Watch the chef slicing the roast duck live


pic(12).jpg


Taste Chinese hot pot


pic(14).jpg


Visit the Korean War Museum

Dandong Virtue River Technology Co., Ltd All rights reserve 辽ICP备11018208号-1 Technology support: Yaluriver Network Cooperation
TOP